Project Description
The project required the renovation of a failing bridge in a waterway. Also required shoreline protection retaining walls.The shoreline work included removal of walls, sitework, excavation, and slope protection. Mountain West Construction provided Redi-Rock retaining wall engineered gravity blocks, projects oversite, bridge surfacing and materials. The river was dry during construction. This required a tight schedule before spring runoff watered the channel again.
- $177,144
- Bridge Renovation
- Shoreline Protection Upgrade
- Brett Kearl, PM 435‐553‐1313